{"version":"2026-10-02.2","occupation":{"id":"PM","code":"15-1299.09","name":"IT项目经理","nameEn":"Information Technology Project Managers","mapping":"以IT项目经理的任务为参照；产品战略、产品发现等职责需另补产品岗位资料，不视为完整产品经理目录","sourceUrl":"https://www.onetonline.org/link/summary/15-1299.09","taskIds":["PM-16169","PM-16154","PM-16157","PM-16152","PM-16155","PM-16159","PM-16156","PM-16163","PM-16151","PM-16162","PM-16164","PM-16170","PM-16168","PM-16160","PM-16166","PM-16161","PM-16171","PM-16153","PM-16165","PM-16167","PM-16158"]},"task":{"id":"PM-16152","occupationId":"PM","sourceTaskId":"16152","title":"提交项目交付物，确保符合质量标准","sourceStatement":"Submit project deliverables, ensuring adherence to quality standards.","sourceVersion":"O*NET 31.0","sourceUrl":"https://www.onetonline.org/link/summary/15-1299.09#Tasks","sourceTaskType":"Core","importance":4.25,"scenario":"指定交付清单、质量条款与接收者","coveredActions":["逐条检查质量条款","整理提交材料","提交一个获准版本的交付物","接受项目交付"],"notCovered":["该场景之外的组织规则、其他系统或数据、长期结果尚未验证"],"dependencyBasis":"本场景显式审阅的顺序依赖；不是O*NET或DWA规定的唯一工作流","decompositionBasis":"本站基于任务陈述及关联DWA设计的场景还原候选；DWA不是执行顺序或官方原子切分","relatedActivities":[{"id":"4.A.1.a.2.k.2","name":"Inspect products or operations to ensure that standards are met."},{"id":"4.A.2.a.1.g.8","name":"Evaluate utility of software or hardware technologies."}],"atomIds":["PM-16152-A1","PM-16152-A2","PM-16152-A3","PM-16152-A4"],"caseIds":["PM-02"],"completionRule":"全部必要原子产物与依赖通过，且需要的负责人确认、真实交互或现场动作有实际证据，才可验收本页限定场景；未覆盖的来源动作仍需补齐，不能据此宣告职业任务在所有场景完成","successRate":null,"fieldValidated":false},"atoms":[{"id":"PM-16152-A1","taskId":"PM-16152","title":"逐条检查质量条款","scope":"指定交付清单、质量条款与接收者","inputs":["项目目标、已有计划、预算、干系人需求与授权边界"],"output":"验收检查表","acceptance":["验收检查表逐条列出核对对象、实际依据、差异和未通过项","缺证据保留未知；不能把自述、字段齐全或格式相同当作验收通过"],"dependsOn":[],"mode":"ai_candidate","feasibility":"unverified_candidate","assessmentBasis":"输入与产物可界定，可提出独立验收；这是待测试的分工建议","evidence":[{"sourceId":"E04","relation":"adjacent_benchmark","claim":"相关任务族的测试参考","limit":"未逐题等同到本原子项；外部总分不分配到这里"}],"verifiedExamples":[],"successRate":null,"fieldValidated":false,"stopCondition":"输入或权限缺失、关键验收失败或存在未解决冲突时，保留产物并交回责任人；不能自动宣告父任务完成"},{"id":"PM-16152-A2","taskId":"PM-16152","title":"整理提交材料","scope":"指定交付清单、质量条款与接收者","inputs":["项目目标、已有计划、预算、干系人需求与授权边界","前置产物：验收检查表"],"output":"交付清单","acceptance":["交付清单覆盖指定范围内的对象，事实与假设分开且事实有出处","缺失条件、冲突与未支持结论明确列出；表示方式可不同，不按固定措辞验收"],"dependsOn":["PM-16152-A1"],"mode":"ai_candidate","feasibility":"unverified_candidate","assessmentBasis":"输入与产物可界定，可提出独立验收；这是待测试的分工建议","evidence":[{"sourceId":"E04","relation":"adjacent_benchmark","claim":"相关任务族的测试参考","limit":"未逐题等同到本原子项；外部总分不分配到这里"}],"verifiedExamples":[],"successRate":null,"fieldValidated":false,"stopCondition":"输入或权限缺失、关键验收失败或存在未解决冲突时，保留产物并交回责任人；不能自动宣告父任务完成"},{"id":"PM-16152-A3","taskId":"PM-16152","title":"提交一个获准版本的交付物","scope":"指定交付清单、质量条款与接收者","inputs":["项目目标、已有计划、预算、干系人需求与授权边界","前置产物：交付清单","获准的对象或系统范围、可用真实渠道或工具、记录权限、失败接管人"],"output":"提交记录","acceptance":["提交记录包含实际交付版本、接收渠道、时间与送达状态","提交未发生或被拒绝时保持未提交，不以交付清单或草拟通知替代实际提交"],"dependsOn":["PM-16152-A2"],"mode":"environment_action","feasibility":"environment_unverified","assessmentBasis":"依赖真实交互渠道、授权与工具；绑定执行环境后测试AI独立完成性，不把权限门槛当能力失败","evidence":[],"verifiedExamples":[],"successRate":null,"fieldValidated":false,"stopCondition":"输入或权限缺失、关键验收失败或存在未解决冲突时，保留产物并交回责任人；不能自动宣告父任务完成"},{"id":"PM-16152-A4","taskId":"PM-16152","title":"接受项目交付","scope":"指定交付清单、质量条款与接收者","inputs":["项目目标、已有计划、预算、干系人需求与授权边界","前置产物：提交记录"],"output":"接收回执","acceptance":["接收回执写明决定人、授权范围、所依据的事实及仍未确认项","不能用AI草稿、模型成绩或工具成功状态替代负责人真实确认"],"dependsOn":["PM-16152-A3"],"mode":"human_decision","feasibility":"requires_human","assessmentBasis":"当前场景含负责人的决定或现场动作","evidence":[],"verifiedExamples":[],"successRate":null,"fieldValidated":false,"stopCondition":"输入或权限缺失、关键验收失败或存在未解决冲突时，保留产物并交回责任人；不能自动宣告父任务完成"}],"completionRules":{"example":"只证明保存的AI产物在一个限定例中通过，不能外推子任务完成率","adjacent":"相近基准证明测试中存在相关能力，不证明本站原子项已完成","candidate":"可交给AI先尝试是编辑建议，完成性待验收","human":"人的决定或现场动作是当前场景的接管点，不等于AI不能提供辅助","rollup":"父任务须通过所有必要产物、依赖与人工门槛；禁止平均子任务数量或外部分数得到职业自动化率"}}